Installation Installation Process How Much Do I Need  
  Installation
  Incredibly Easy
 

Fully wrapped in sturdy double-sided fire-retardant foil, Coolbatts is installed or rather, placed as a layer above your ceiling.

 
1   2
  Through the ceiling manhole...     ...onto the ceiling floor.
  Quick to Install
 

It takes only 2 to 3 hours for an area of 800 sq. ft. No nailing, screwing or gluing is needed. Existing electrical wiring is placed above the Coolbatts layer.

  Lightweight
 

A roll of Coolbatts weighs less than 3kg.
You can rest assured that your ceiling will not be damaged.

 

 

 

 

 

Copyright© 2010 Coolbatts. All Rights Reserved. Website design & development by CMC.