Fully wrapped in sturdy double-sided fire-retardant foil, Coolbatts is installed or rather, placed as a layer above your ceiling.
1
2
Through the ceiling manhole...
...onto the ceiling floor.
Quick to Install
It takes only 2 to 3 hours for an area of 800 sq. ft. No nailing, screwing or gluing is needed. Existing electrical wiring is placed above the Coolbatts layer.
Lightweight
A roll of Coolbatts weighs less than 3kg.
You can rest assured that your ceiling will not be damaged.